Client: Municipality of Lakeshore
Location: Belle River, Ontario
Completed: November 2024
Overview:
ANET Fiber Tech Inc. has very recently completed the installation of dual-port Level 2 EV chargers for the Municipality of Lakeshore. The awarded scope included supply and installation of conduit and electrical wiring, concrete foundations, bollards, signage, line-painting, and full commissioning of the dual-head pedestal-mounted EV charging station provided by the supplier. Our team coordinated with utility authorities to ensure ESA compliance, LTE communication integration, and seamless activation of the charging system.
ANET executed this project with a strong focus on quality workmanship, safe site practices, and maintaining uninterrupted public access throughout construction. All civil and electrical work — including concrete pad installation, trenching, proper grading, and electrical tie-ins — was completed to municipal and utility specifications, ensuring long-term reliability and future-ready EV infrastructure for the Lakeshore community.

