Remote Highway CellTower Network (Highway 652, ON)  

Date Completed: July 2022 
Value: $3 million  
Scope: Civil package for three offgrid tower sites along a remote highway corridor. Deliverables included 10acre tree clearing, foundation excavation with frost mitigation, formwork, rebar, concrete pours, compaction, accessroad grading, and permanent fencing. Weatheradaptive equipment deployment and milestonebased scheduling ensured onbudget delivery despite winter conditions.  

Remote Highway CellTower Network (Highway 652, ON)

Key Highlights

  • Executed complete civil works for three remote, off-grid telecom sites.
  • Cleared 10 acres of dense forest and constructed durable access roads.
  • Installed frost-protected foundations with specialized insulation and drainage.
  • Completed formwork, rebar, and high-strength concrete pours in winter conditions.
  • Installed permanent site fencing for security and protection.
  • Leveraged weather-adaptive equipment and milestone-based scheduling to ensure on-time, on-budget delivery.